Sparks City Council Meeting 1/13/2020 2:00:00 PM

    Monday, January 13, 2020 2:00 PM
    Council Chambers, Legislative Bldg, 745 4th Street, Sparks, NV

General Business: 9.9

Title: Consideration, discussion and possible approval of the Victorian Square Infrastructure-Phase 2B Project, Bid No. 19/20-011, PWP #WA-2020-076 construction contract (AC-5638) with Anchor Concrete in the amount of $315,625.
Petitioner/Presenter: John Martini, P.E., Assistant City Manager/Brian, D. Cason, S.E., P.E., Capital Projects Manager
Recommendation: Staff recommends City Council approve the construction contract with Anchor Concrete.
Financial Impact: $315,625.00. This project will be budgeted from Fund 1415 Victorian Square Room Tax Fund, CIP #19-2100 Victorian Square Infrastructure Phase 2B, Account 604060 Site Improvements
Total Costs: $315,625.00
Fund: Victorian Square Rm Tax CP Fund    Account: 604060
Program: 1415 Victorian Square Infrastructure Improvement Proj Section 2 (19-2100)
Amount: $315,625.00    Budget Status: Budget Exists
Business Impact (Per NRS 237):
    
A Business Impact Statement is not required because this is not a rule.
Agenda Item Brief:

This project consists of the removal of existing trees and tree planters, removal and replacement of existing pavers, sidewalk, curb, gutter, and catchbasins, irrigation and electrical improvements, and abandonment and relocation of an existing bus stop.  Staff recommends approval of the construction contract with Anchor Concrete.



Background:

Victorian Square public improvements were originally constructed in two phases, the first being in 1988 and the second in 1990.  In February 2013 City staff from Engineering, Planning, Public Works Maintenance, Parks and Rec, and Special Events reviewed the area to identify repairs due to deterioration and improvements for use during special events.  Based on this review, a plan was developed to phase improvements to Victorian Square in the City Capital Improvement Plan.  The current Phase, 2B, is located on Victorian Ave between Victorian Plaza Cir (11th St) and 10th St.    



Analysis:

The project was advertised on November 12, 2019 and one addenda was issued during the bid.  Seven (7) bids were received at City Hall on December 3, 2019 as a result of the formal bid process.  Staff has reviewed the bids, found no irregularities, and recommends award to the low bid submitted by Anchor Concrete, in the amount of $315,625, which includes a force account of $25,000.  The construction contract for the project has been attached for reference.  A detailed bid recap is attached to the staff report and a bid summary of the qualified bidders is shown below for your review:

Engineers Estimate $341,275.00
Anchor Concrete $315,625.00
A&K Earthmovers $317,000.00
Q&D Construction $332,092.00
Spanish Springs Construction $338,444.00
Sierra Nevada Construction $349,007.00
NVNJ Construction $397,900.00
Granite Construction $476,476.00

 



Alternatives:
  1. Council could approve the construction contract as outlined by Staff.
  2. Council could reject the construction contract and provide direction to the City Manager.


Recommended Motion:

I move to approve the construction contract (AC-5638) for the Victorian Square Infrastructure-Phase 2B Project with Anchor Concrete in the amount of $315,625.



Attached Files:
     01-Bid Re-cap-Vic Square Phase 2B- Bid 19-20-011.pdf
     03-Anchor Concrete Contract-Vic Square Phase 2B.pdf
     Victorian Square Infrastructure Map.pdf
Previous Item
Next Item
Return To Meeting