Sparks City Council Meeting 2/9/2015 2:00:00 PM
Monday, February 9, 2015 2:00 PMCouncil Chambers, Legislative Bldg, 745 4th St., Sparks, NV
Consent Items: 8.3
Total Costs: $18,114.29
Fund: Sanitary Sewer Cap Proj Fund Account: 604090 Program: TMWRF Nitrification Valves & Vaults Improvement Project Ph. 1 (14-6600C) Amount: $18,114.29 Budget Status: Over Budget (See Budget Correction Plan) |
A Business Impact Statement is not required because this is not a rule.
TMWRF staff is asking the City Council to approve an amendment to the reimbursement agreement to the City of Reno with HDR Inc. in the amount of up to $18,114.29 for the Nitrification Trickling Filter Valve Vault project at TMWRF.
Background:
TMWRF operates six nitrifying filters (NTF’s) as part of the nitrogen removal process. This is a very critical stage of TMWRF’s treatment process and all six NTF’s must be operational for TMWRF meet the discharge permit nitrogen limits mandated by the Nevada Division of Environmental Protection (NDEP). TMWRF originally requested that the project design scope be to replace the aging control valves for the NTF’s and also house the new valves in full access vaults. Through detailed design it was determined that the construction process necessary to retrofit the control valves for the NTF’s would be extremely complex requiring vaults in excess of 20-ft. deep and working around existing 24-36 in. diameter piping which must remain operationally active through the construction. Bids received for the project incorporating designs for full access vaults revealed the cost for the individual vaults to exceed $200,000 in some cases. After review of the bids it was determined that properly engineered, direct-bury valves would serve the needs of the treatment plant.
HDR was directed to prepare new plans with direct bury valves. This redirection will result in additional design tasks and the current proposed contract amendment, however, the ultimate construction is expected to be significantly less expensive that the original vault design.
Analysis:
The City of Reno will administer the contract and will be reimbursed for a portion of the costs by the City of Sparks through the Sparks – Reno cost sharing agreement for TMWRF. The City of Reno and the City of Sparks share the cost for this project based upon their ownership of TMWRF, which is 68.63% for Reno and 31.37% for Sparks. Based on the ownership percentages, Sparks’ share is up to $18,114.29. The cost split between Reno and Sparks is shown in Table 1, attached.
Alternatives:
Council could direct the manager to have staff provide other alternatives.
Recommended Motion:
I move to approve the amendment to the reimbursement agreement with the City of Reno for the Sparks’ share of a contract for engineering design services with HDR, Inc. an amount not to exceed $18,114.29.
Attached Files:
Table 1.pdf
City of Reno Staff Report-Nitrif Valve Replacements.pdf