Total Costs: $557,007.00
Fund: Road Fund Account: 604140 Program: 1401 Pavement Mgmt Program-Street Rehabilitation (13-0502) Amount: $557,007.00 Budget Status: Budget Exists |
A Business Impact Statement is not required because this is not a rule.
Background:
This project will remove and replace rundown curb and gutter, sidewalk, and reconstruct the roadway with new asphalt on E. Gault Way from Probasco Way to York Way, La Grange Court and Sheffield Court.
Analysis:
This 2013 Street Rehabilitation Unit 2 project is part of the City’s Transportation System - Pavement Management Program. The project was prioritized through the City’s Pavement Management System and outlined in the 5 year Program of Projects. The project scope identifies the need to remove and replace as needed rundown curb gutter, sidewalk, driveway approaches, and reconstruct the roadway with new asphalt on E. Gault Way from Probasco Way to York Way, La Grange Court and Sheffield Court. The City of Sparks received five (5) qualified bids for this project, which were received March 14, 2013 at 1:45 p.m. and opened on March 14, 2013 at 2:00 p.m. A bid summary of the qualified bidders is shown below:
- Sierra Nevada Construction $557,007
- Spanish Springs Construction $569,444
- Granite Construction $569,569
- A&K $587,774.22
- Q&D Construction $635,530
Alternatives: 1. City Council could award the project as outlined by Staff. 2. City Council could reject the proposed project and provide direction to the City Manager.
Recommended Motion: I move to award the 2013 Street Rehabilitation Unit 2 project to Sierra Nevada Construction, in the amount of $557,007.