Sparks City Council Meeting 11/26/2018 2:00:00 PM

    Monday, November 26, 2018 2:00 PM
    Council Chambers, Legislative Bldg, 745 4th St., Sparks, NV

Consent Items: 8.3

Title: Consideration, discussion and possible approval of a contract (AC-5536) with Poggemeyer Design Group, for construction administration, testing, and inspection, for the El Rancho Sewer Improvements Project, in the amount of $117,456.55.
Petitioner/Presenter: John A. Martini, P.E., Community Services Director/Jon R. Ericson, P.E., P.T.O.E., City Engineer
Recommendation: Staff recommends Council approve the contract.
Financial Impact: N/A
Total Costs: $117,456.55
Fund: Sanitary Sewer Cap Proj Fund    Account: 604150
Program: El Rancho Sanitary Sewer Reliever Project (18-6594)
Amount: $117,456.55    Budget Status: Over Budget (See Budget Correction Plan)
Budget Correction Plan:
Funding for the professional services contract will be transferred from Project 19-6586, Stanford Way Upsize Project, which has $977,345 available. The Stanford Way project was budgeted using a removal and replacement construction method. Staff has reviewed an option of slip lining the Stanford Way storm drain line which would be significantly cheaper in overall construction cost. The remaining budget authority for the Stanford Way Upsize Project would be sufficient utilizing the slip lining method.
Business Impact (Per NRS 237):
    
A Business Impact Statement is not required because this is not a rule.
Agenda Item Brief:

Due to limited staff resources, Poggemeyer Design Group was asked to submit a proposal for administering the construction phase of the project to include materials testing and construction inspection.  The professional service fee was reviewed by staff. Staff recommends Council approve the contract.  



Background:

This project was identified in the 2016 Sewer Model Update as a high priority capital improvement project.  The scope includes upsizing the existing 8” sewer to 15” sewer.  New 15” sewer will be installed through the El Rancho Dr intersection with Oddie Blvd to connect the northern and southern El Rancho Dr sewer systems.  The project will provide much needed capacity improvements for the El Rancho Dr area as well as the Oddie Blvd and Greenbrae redevelopment district.

Due to limited staff resources, Poggemeyer Design Group was asked to submit a proposal for administering the construction phase of the project to include materials testing and construction inspection. 



Analysis:

Poggemeyer Design Group submitted a proposal with a not to exceed amount of $117,456.55.  The proposal is attached to the staff report for Council’s review.  Funding for the professional services contract will be transferred from Project 19-6586, Stanford Way Upsize Project, which has $977,345 available.  The Stanford Way project was budgeted using a removal and replacement construction method.  Staff has reviewed an option of slip lining the Stanford Way storm drain line which would be significantly cheaper in overall construction cost.  The remaining budget authority for the Stanford Way Upsize Project would be sufficient utilizing the slip lining method. 



Alternatives:
  1. City Council could approve the contract as outlined by Staff.
  2. City Council could reject the contract and provide direction to the City Manager.


Recommended Motion:

I move to approve the contract with Poggemeyer Design Group, for construction administration, testing, and inspection, for the El Rancho Sewer Improvements Project in the amount of $117,456.55.



Attached Files:
     01 - Poggemeyer Proposal.pdf
     02 - Poggemeyer Contract-El Rancho Sewer Construction Management.pdf
Previous Item
Next Item
Return To Meeting