Sparks City Council Meeting 1/13/2014 2:00:00 PM

    Monday, January 13, 2014 2:00 PM
    City Council Ch;ambers, Legislative Building, 745 Fourth Street, Sparks, NV

General Business: 6.3

Title: Consideration and possible award of a contract to provide Inspection and Materials Testing Services for the North Truckee Drain Realignment Phase 1 Project with Construction Materials Engineers, Inc. in the amount of $585,264.
Petitioner/Presenter: John Martini, P.E., Assistant Community Services Director/Andrew Hummel, P.E., Utility Manager
Recommendation: Staff recommends that the City Council award a contract to provide Inspection and Materials Testing Services for the North Truckee Drain Realignment Phase 1 Project with Construction Materials Engineers, Inc. in the amount of $585,264.
Financial Impact: $585,264 in Storm Drains Capital Fund 1641. $12,000,000 was approved for Project 14-6820 North Truckee Drain Relocation Phase 1 in the FY14 CIP and $2,128,070 of budget authority remains.
Total Costs: $585,264.00
Fund: Storm Drains Cap Proj Fund    Account: 604110
Program: North Truckee Drain Relocation Phase I (14-6820)
Amount: $585,264.00    Budget Status: Budget Exists
Business Impact (Per NRS 237):
    
A Business Impact Statement is not required because this is not a rule.
Agenda Item Brief: Consideration and possible award of a contract to provide Inspection and Materials Testing Services for the North Truckee Drain Realignment Phase 1 Project with Construction Materials Engineers, Inc. in the amount of $585,264. Construction of the North Truckee Drain Phase 1 Realignment Project will require a substantial amount of materials testing and inspection which is above the capabilities of City staff. Additionally, night work (and associated required inspection) will be performed for certain portions of the project (namely the Greg Street crossing). Staff recommends approval.


Background: The North Truckee Drain Realignment Phase 1 Project was awarded to Q&D Construction at the December 9, 2013 City Council meeting. Work is anticipated to begin as early as mid-January. Due to the scope of this project, a significant amount of materials testing (concrete, reinforcing rebar, pavement, and soil backfill) will be required. Additionally, the Contractor will be performing a significant amount of work on a 24-hour schedule to ensure project completion with a reduced amount of business impact. The Community Services Engineering division is not staffed nor equipped to provide the services required. As such, Construction Materials Engineers, Inc. (CME) was asked to provide a proposal to perform these services. A scope of work was prepared based on the quantity of materials and proposed work schedule. Total anticipated cost for the services is $585,265.

Analysis: Materials Testing and Inspection services are a key component for successful construction of the North Truckee Drain Realignment Phase 1 project. These services will help insure that the project is constructed as desired, resulting in a long service life. CME is on the City of Sparks’ on-call materials testing and inspection list.

Alternatives: 1. City Council could accept the Inspection and Materials Testing Services contract as outlined by Staff. 2. City Council could reject the Inspection and Materials Testing Services contract and provide direction to the City Manager.

Recommended Motion: “I move to award the contract to provide Inspection and Materials Testing Services for the North Truckee Drain Realignment Phase 1 Project with Construction Materials Engineers, Inc. in the amount of $585,264.”

Attached Files:
     CME Proposal.pdf
     CME Contract-NTD Phase 1.pdf