Project: North Truckee Drain Realignment-Phase 3 - CANCELLED
Bid #15/16-015 PWP #WA-2016-163
Description: Installation of 2,540 feet of (2) 14’x10’ parallel reinforced concrete box culverts with associated structures; installation of 740 feet of (2) 8’x8’ parallel reinforced concrete box culverts with associated structures; installation of miscellaneous sized reinforced concrete box culverts with associated structures; installation of 1,335 feet of storm drain; select demolition and replacement of utility service lines and conduits; excavation, backfilling and grading the site; placement of asphaltic pavement and concrete flatwork; dewatering; traffic control; and other activities for a complete installation and site restoration.
Submission Deadline: May 11, 2016 Engineer's Estimate: $14,000,000.00
Project Manager: Amber Sosa    PM Phone: (775) 353-7863    PM Email: asosa@cityofsparks.us